It is true that piling concrete is expensive, but now the demand is rising by the economic well-off people should also want to invest in their homes in the best way. Thu Duc Construction and Construction said that the land of many areas in the city is quite weak, so many old ponds and lakes, therefore, the state of the house is often broken, especially The house is 4.5 or higher. With concrete piles of nearly ten meters deep, compressed with high compressive force, the total compression to the piles up to a thousand tons, then the force with a house 300-400 tons is a small story. After piling, the new masonry treatment poured nail beam lock the head of the pile, and then nail up, ensuring the sustainability of the house.
In order to force concrete piles effectively, Thu Duc Engineering and Construction Company recommends geological survey of the works first, then excavation of the entire old foundation to the ground, if the ground is stable, then not need to dig out. The length of concrete pile length depends on the number of piles, on average one day pressed 80-100 meters. Executed in ordinary civil workers, only hydraulic presses with a small capacity of anchors, with a pressure of 30 tons on one end of the piles of high-rise buildings must use a pressure machine with 100 tons on one end. pile.
At present, there are many construction companies receiving concrete piles for customers, the quality is equal and the price is stable, because raw materials are not influenced by market price fluctuations. Not too technical. However, if required, the customer should contact at least 15 days in advance so that the construction site can be thoroughly investigated and based on the results of the land survey as well as design requirements for numerical calculation. Quantity to avoid, waste. Secondly, there are times when the number of customers needing to be too high, the company can not meet, so customers have to wait time, customers should book ahead to the company to serve the best and on schedule of the project.